Concrete slab, subfloor and floor joist contractors in Australia

Any floor covering installation requires prior preparation. No matter what yours under flooring is, it must be checked and prepared before new flooring goes down. 

Concrete slab foundation, plywood, and yellow tongue and groove flooring can be leveled with a floor leveling compound or grinding down in high sport to achieve a flat surface for new carpet or flooring installation.

Flooring Domain connects you with experts in slabs and subfloor preparation, able to help you with any request, before your new floorcovering installation.

Tasks like cleaning, painting, gaps, cracks sealing, or moisture barrier applications are necessary for 90% of all floor projects.  

Get
Quotes

Back to top